


I then had to cut the top rung off of the top of the cage to house the main grow bed and then cut another row out so I could fit the metal cage down the stairs.


I did have to add a couple more supports as it wasn't wide enough.
I had to buy a pond liner for the grow bed and after sizing and cutting the plumbing screwed right down to the liner and sealed with silicone.
The next few images are of the lid and the plumbing I added.
You can see the plumbing coming up through the pond liner. At this point the lid is screwed tight to the bottom of the grow bed.
I now need to stop posting AP stuff and go back to studying for my test tomorrow. Here is a good site and found it while researching recipes.
No comments:
Post a Comment